For single tank, it takes around 3-5 weeks to deliver.

For integrated systems, it normally takes 18 to 20 weeks to deliver.

ASME/PED certified equipment will take 18 to 20 weeks.

You are welcome to contact us for details if any needs.

Plastic wrap film should be applied around the entire equipment.

Electrical parts should be disassembled and packed in crates if possible, otherwise it should be fully protected from water or any kind of potential damage in shipping.

Tank will be put down and sitting on a CS frame support, steel wire will be used for fasten tank to support. Rubber should be applied to where steel wire is touching the equipment.

When fixing the equipment in container, multiple fixing belts and/or steel wires should be used to make sure no movement of equipment.

should be used to make sure no movement of equipment

Yes, we will.

Equipment will be thoroughly washed before packing. Water used for washing should not have chloridion content more than 25mg/L to avoid damage of stainless-steel surface. Water stains must be cleaned once washing is finished.

Normally we will ship the equipment by sea due to the weight of it.

Air shipping is also an option, but it will cost more.

It depends on your choice.