Brewery Pilot Plant

It provides you with precise temperature and pressure control, easy scalability, consistency in flavor and quality, reduced risk of contamination, and the ability to monitor and adjust the fermentation process in real-time.

BREWERY EQUIPMENT

Product Features

Brewery Pilot Plant

Brew house system consists of Mash Tun, Lauter Tun, Boiling Kettle, Whirlpool kettle, Hop Dosing Equipment. The main equipment adopted international quality standards of sanitary 304 stainless steel, to deal with the tank by plasma cutting, pure Ar-shielding welding, mechanized automatic polishing machine .

The brew house system could be included two-vessels brew house, three-vessels brew house and four-vessels brew house. Two-vessels brew house includes mash/lauter tun and kettle/whirlpool tank. Three-vessels includes mash tank, lauter tun and kettle/whirlpool tank. Four-vessels includes mash tank, lauter tun, boiling kettle and whirlpool tank.

The capacity is bigger, the vessels is more. It is just in order to reduce the brewing time, improve the working efficiency.

Sample of Equipment, customize available also

Brewhouse Parameters
Headspace +30%
Heating way Steam, Electric, Direct fire
Material SUS304, SUS316, Red Copper
Detailed Specification 1. Insulation:rock wool
2. Insulation thickness:80mm
3. Interior Shell: SUS 304 full welded;TH=3.0mm
Exterior Shell: SUS 304 full welded;TH=2.0mm
4. Thermowell with high accuracy temperature sensor
5. Dished top and conical bottom
6. Sanitary liquid level indicator with valves
7. Raker with motor on top with Scrape board, VFD
8. Milling sieve plate
9. Side spent grain door
10. Washing grain pipe
11. CIP 360°rotary spray device
12. Stainless steel manhole on top
13. Material: SUS304,Brushed outer shell
14. 4pcs completely SUS304 heavy duty legs
15. With all matched valves and accessoriesOption: glass lamp, glass manhole, grist hydrator, wort grant, hop filter.

Other special request, can be customized according for your brewhouse

Manufacturing Arts 100% TIG welding with pure argon gas shield;
Interior Finish: Overall polishing to ≤0.6μm without dead corner
Inner tank inside surface fully acid washed and passivated after polishing; form protective film, easy to clean, no sanitary dead angle.

certifications

PureyMech’s products are proudly certified by

Elementor Single Product #616
Elementor Single Product #616
Elementor Single Product #616
Elementor Single Product #616
Elementor Single Product #616

designed and manufactured according to

Elementor Single Product #616
Elementor Single Product #616

Frequently Asked Questions

Edit Content

Sanitary grade of SUS304/SUS316L Stainless Steel Vendor: Shanghai Bao Steel Group Corporation or equivalent supplier.

In order to keep the raw materials organized and make sure proper material will be used, we insist asking the material vendor to provide original material test report. Also, we will do in-coming tests to ensure the material is qualified:

  • Metal spectrum analyzer
  • Thickness gauge
  • Roughness detector

All designing, manufacturing and inspection processes are performed according to GB150-1998. ISO9001 Quality Management System Standard will also be applied throughout the entire manufacture process.

Yes, with our certified workshop and excellent welding technics, we can provide you with high quality ASME or PED pressurized equipment.

As multiple tests and inspections are required, lead time of such equipment is longer than normal pressure equipment, it usually takes 18 to 20 weeks to finish.

Plasma welding machine imported from Germany will be used for tank longitude and girth welding and fillet welding to make sure the welding seam smooth and even.

Also, GTAW welding technology will be applied, inert gas concentration is 99.999%. Different welding wire ER316L or ER308 will be applied for different material of SS plate.

For particular circumstances, electric-arc welding will be applied. Welding material used for:

S304-S304: A102; S316L-S316L: A022; Different SS: A302.

Welding seam between jacket and vessel shall be NDT inspected according to JB4730-94 to ensure the impermeability and long service life.

For single tank, it takes around 3-5 weeks to deliver.

For integrated systems, it normally takes 18 to 20 weeks to deliver.

ASME/PED certified equipment will take 18 to 20 weeks

You are welcome to contact us for details if any needs.

Yes, customization order is acceptable.

You may send over the requirements, we will realize your design and provide you with the most cost-efficiency solutions.

Edit Content

For single tank, it takes around 3-5 weeks to deliver.

For integrated systems, it normally takes 18 to 20 weeks to deliver.

ASME/PED certified equipment will take 18 to 20 weeks.

You are welcome to contact us for details if any needs.

Plastic wrap film should be applied around the entire equipment.

Electrical parts should be disassembled and packed in crates if possible, otherwise it should be fully protected from water or any kind of potential damage in shipping.

Tank will be put down and sitting on a CS frame support, steel wire will be used for fasten tank to support. Rubber should be applied to where steel wire is touching the equipment.

When fixing the equipment in container, multiple fixing belts and/or steel wires should be used to make sure no movement of equipment.

should be used to make sure no movement of equipment

Yes, we will.

Equipment will be thoroughly washed before packing. Water used for washing should not have chloridion content more than 25mg/L to avoid damage of stainless-steel surface. Water stains must be cleaned once washing is finished.

Normally we will ship the equipment by sea due to the weight of it.

Air shipping is also an option, but it will cost more.

It depends on your choice.

Edit Content

Yes, we do. On-site installation service is available with charges.

Engineers and installation workers will be dispatched to your site to finish installation.

Service provided against charges, please contact us for more details.

Yes, we do.

Engineers will be dispatched to your site to conduct commissioning.

Training service is also available.

Service provided against charges, please contact us for more details.

Edit Content

One year of warranty provided.

Replacement will be provided freely if the failure is NOT artificial.

Shipping cost of free replacement will be born by us.

Yes, we do.

Wi-fi connections are installed in your system's control box, our engineers is able to debug the system online.

You can also contact our sales representatives for online support as well.

Did we miss your question? Drop us a line and we will
get back within 24 hours.

Get to know us

About PureyMech

An manufacturer with profession and passion

PUREYMECH is a high-tech enterprise integrating design, manufacturing and installation of the biochemical, pharmaceutical and sanitary fluid equipment.

Innovative design strategies that achieve significant cost savings for our clients throughout the entire service life of the plant are key components in our portfolio.

 

Design Service

We offer the full range of design/build services needed to realize projects. We manage the coordination of the entire project using turnkey solution and help our clients measure the success against the complete solution.

Plasma Welding

All procedures took place in the workshops of PUREYMECH are in accordance with various industrial standards (ISO, DIN, IDF, SMS). PUREYMECH is equipped with complete inspection facilities, such as equipment of hydraulic test, X-ray flaw detection, chemical analysis and mechanical property test.

complete your system

Other equipment and ancillaries of PureyMech

Elementor Single Product #616

Need help with design of your plant?

P&ID design service
available

Contact now and submit your URS, customized solution will be provided.

Contact PureyMech

Please use the form below to contact PureyMech.

Thank you for subscribing!